Sequoia HS Lenkurt Chem. Lab

QUICK FACTS

Location:
Redwood City, CA
Square Footage:
1,200
Owner:
Sequoia Unified School District
Architect:
IBI Group
Completion Date:
August 2013
Project Duration:
2 Months
Project Cost:
$669,000

Project Summary

Rodan Builders was awarded the contract to renovate the Chemistry Lab at Sequoia High School in Redwood City.  The scope started with the complete demo of the space down to the structure.  New HVAC units were installed including a new pump fan for fume hood that as installed.  Other work included a new acoustical ceiling and all new lighting fixtures and fans.  All new casework was installed with a teaching wall, built in storage and work stations with sinks, gas and power at each location.

Challenges here included a tight schedule and coordination between trades due to work having to be completed over the summer break while the classroom wasn’t being utilized.  This lab has all of the new technology with the teaching station, including two projectors and 55″ flat screen TV’s for easy viewing of students throughout the classroom.


Download PDF Version

VIEW SIMILAR PROJECTS