Albany Kiely Storm Drain Replacement

QUICK FACTS

Location:
City of San Jose
Owner:
San Jose Public Works Dept
Completion Date:
2009
Project Duration:
4 months
Project Cost:
$775,000

Project Summary

Project consisted of installing approximately 4,ooo lineal feet of 36″ HDPE storm drain and numerous new manholes throughout city streets of San Jose. Typical trench depth was 13 feet. ¬†Extensive temporary shoring was required at all phases of construction.